Difference between revisions of "HMS Sharktypus"
Giantsquid (talk | contribs) |
Giantsquid (talk | contribs) |
||
Line 13: | Line 13: | ||
[[File:Sharktypus4.jpg |200px|Almost finished.]] | [[File:Sharktypus4.jpg |200px|Almost finished.]] | ||
+ | == Shakedown cruise == | ||
+ | [[File:Sharktypus6.jpg |thumb|right |400px|Artist's rendition of the Sharktypus shakedown cruise.]] | ||
+ | |||
+ | The shakedown cruise of the (unpainted) HMS Sharktypus is scheduled to take place on June 24, 2001. | ||
== See also == | == See also == |
Revision as of 22:08, 23 June 2011
The HMS Sharktypus is a stitch-and-glue flat-bottom dinghy with a Sharktypus paint job which is currently under construction. When complete, it will serve as the principle research dinghy of the Bacliff Exploration Society. It is planned to be fully equipped with an inboard weed-eater motor, ham radio, flounder lights, glass bottom, and oar locks shaped like shark fins.
Construction
The Sharktypus is being constructed in the ESOB Shipyards using the cheapest door skin plywood that money can buy, as well as scrap hurricane plywood, and tomato stakes. The builders have embraced a design philosophy which ignores such things are measurements and common sense, in favor of "listening to the wood". This process has already led to many innovations which will be studied by naval architects for decades to come.
Gallery
Shakedown cruise
The shakedown cruise of the (unpainted) HMS Sharktypus is scheduled to take place on June 24, 2001.
See also
External links
- Lauan Plywood (Article that claims building a dinghy with this grade plywood is insane)
- Stitch-and-glue dinghy construction